TRINITY COLLEGE

ACOUSTIC GYMNASIUM BUILD

TRINITY COLLEGE

ACOUSTIC FRAMEWORK

TRINITY COLLEGE

ACOUSTIC ROOF PREPARATION

TRINITY COLLEGE

ACOUSTIC PANELLING

About The Trinity College Project

  Status: Completed

  Location: Evanston South

  Floor Area:

  Works Completed:

  Price: 1.1M

Future Carpentry and Linings completed building works in November 2024 which included:

Assembly Room - Custom Acoustic Panelling, Acousting Wall Panelling, Acoustic Flooring & Carpentry Package